Sangrur Paddy Straw CBG Plant
Sangrur, Punjab
Compressed Biogas · Turnkey EPC · PAN India
GoSa Green Energy designs, builds and operates Compressed Biogas plants end to end — from the first feasibility study to the first cylinder of CBG, and every operating day after commissioning.
Who we are
Headquartered in Moga, Punjab — at the heart of India’s agri-residue belt — GoSa Green Energy is an engineering-led EPC company focused entirely on Compressed Biogas. We take full ownership of your plant’s design, delivery and performance.
Reports lenders and OMCs trust, built on lab-tested feedstock data.
Typical 12–15 month build schedule from zero date to commissioning.
PESO-compliant gas systems, HAZOP reviews and zero-harm site culture.
SCADA dashboards track gas yield, purity and uptime around the clock.
Complete EPC lifecycle
We remove the interface risk of juggling multiple vendors. One contract, one schedule, one team accountable for your CBG output.
Feedstock, site and financial viability
Process, civil, mechanical & E&I design
Vetted vendors, expediting & QA
Civil works, erection & piping
Start-up, stabilisation & PG tests
Long-term O&M after handover
What we do
Feedstock availability mapping, lab analysis, site selection and bankable detailed project reports.
Learn more 02SATAT LOI, PESO, pollution control board consents, CEIG and offtake agreements handled for you.
Learn more 03Process design, 3D plant layout, digester sizing, upgrading selection and detailed engineering.
Learn more 04Upgrading skids, compressors, agitators and balance-of-plant sourced from proven OEMs.
Learn more 05Civil, mechanical and electrical execution followed by biological start-up and performance tests.
Learn more 06Full plant operations, feedstock logistics, FOM handling and guaranteed uptime after commissioning.
Learn moreFrom feedstock to fuel
Agricultural residue, press mud or urban organic waste goes in. Vehicle-grade Compressed Biogas and organic manure come out. Here is what happens in between.
Baled straw, press mud or segregated waste is received, weighed and stored to keep the plant fed year-round.
Shredding, hydrolysis and slurry preparation unlock more gas from tough lignocellulosic material.
Temperature-controlled CSTR digesters convert organics into raw biogas — roughly 55–60% methane.
H₂S, moisture and CO₂ are removed through VPSA or membrane systems to reach 95%+ methane.
Bio-methane is compressed to 250 bar into cascades for retail outlets, or injected into the city gas grid.
PAN-India presence
Regional project offices and site teams let us mobilise fast, source locally and support every plant we operate.
Featured projects
Sangrur, Punjab
Muzaffarnagar, Uttar Pradesh
Indore, Madhya Pradesh
GoSa delivered our plant ahead of schedule and has run it at rated capacity ever since. Their O&M team treats the plant like their own.
Why developers choose GoSa
Contractual guarantees on CBG output, methane purity and power consumption.
Deep experience with India’s seasonal, mixed and high-lignin feedstocks.
Every plant monetises FOM and LFOM, turning digestate into a revenue stream.
Share your location and feedstock. Our engineers will come back with a preliminary capacity and investment estimate — free of cost.